I think I now know why people only move house once every decade or so. WTF? And this is before Ivy has started packing her clothes!
謝謝Mason和Ginger明天要來幫忙
來不急後悔嘍^▽^
這些大部分都
.
.
.
.
不是我整理的
( ̄▽ ̄)~*
搬過去後才是考驗的開始
Friday, 5 October 2012
Bedroom Doors
Moving day is tomorrow! Fortunately the bedroom doors got installed today! And Mini Lee took the cover off the front door. Kinda wanted to do that myself but ah well.
有人等著要拆大門的塑膠模很久了
每次都跟我吵著要拆
我不讓他拆
結果..................
我老爸給他拆掉了 = =
搬家的前一天
室內後安裝門終於裝上了
哼~~~不是很滿意耶
有人等著要拆大門的塑膠模很久了
每次都跟我吵著要拆
我不讓他拆
結果..................
我老爸給他拆掉了 = =
搬家的前一天
室內後安裝門終於裝上了
哼~~~不是很滿意耶
Thursday, 4 October 2012
Finishing touches
The cleaners were at the house making everything look good. Starting to look like a home now. One of the last jobs to do is to build a low wall around the yard. The builder will take care of that and we will put some steel beams into the concrete as he does it so we can build on the wall later. The irrigation ditch on the left here will also be covered.
Also finalized the kitchen today. Will take 20 days to finish and a billion dollars.
為了讓我們可以在10/9好搬進新家,建商配合我們的時間,接了臨時用水好讓清潔工人將房子清乾淨。
這個週末要開始搬一堆的箱子進去了
其實我們可以等到整個完工好再搬家,從2月開始動工到現在,時間算很充裕,不過有很多原因耽擱,目前住的房子租約到10/9號,所以就變得這麼趕
這兩天終於等到地價稅稅單下來,才能進行二次施工
希望剩下的工程可以在下禮拜二前結束
圖為擋土牆施工
Also finalized the kitchen today. Will take 20 days to finish and a billion dollars.
為了讓我們可以在10/9好搬進新家,建商配合我們的時間,接了臨時用水好讓清潔工人將房子清乾淨。
這個週末要開始搬一堆的箱子進去了
其實我們可以等到整個完工好再搬家,從2月開始動工到現在,時間算很充裕,不過有很多原因耽擱,目前住的房子租約到10/9號,所以就變得這麼趕
這兩天終於等到地價稅稅單下來,才能進行二次施工
希望剩下的工程可以在下禮拜二前結束
圖為擋土牆施工
Wednesday, 3 October 2012
Master bathroom finished.
These finally arrived today. The plumber had trouble getting them even as the floor is not exactly flat to enable water to flow to the drain. He got it about right in the end though.
Mr Lin says he is sending a cleaning crew tomorrow morning to clean everything so it will be spic and span when we move in. His spic and span might be different to mine though.
衛浴設備終於完工了
這是我們特別訂購的浴櫃組
一人一個才不互打架
以後不用跟他搶洗臉台了
不然我又推不動他
只好乖乖等他刷好牙洗好臉
頓時覺得我們主臥浴室變小了耶
Mr Lin says he is sending a cleaning crew tomorrow morning to clean everything so it will be spic and span when we move in. His spic and span might be different to mine though.
衛浴設備終於完工了
這是我們特別訂購的浴櫃組
一人一個才不互打架
以後不用跟他搶洗臉台了
不然我又推不動他
只好乖乖等他刷好牙洗好臉
頓時覺得我們主臥浴室變小了耶
Fence
The digger arrived to dig the fence line today. The builder will put in a low fence for us and we will eventually build on top of that. Also managed to squash my guava tree but I saved it.
經過了漫長的銀行貸款程序及使用執照、稅單....等等
我們的擋土牆終於開始動工了
工人差點將我們種下去的水果樹給毀了
幸好老公剛好去看房子
即時移植到盆栽裡....
不過,甘蔗好像沒救到
找不到了
Railings
Everything is coming together....sort of. We are moving on Saturday so everything must be done by then. The water was turned on today so we will be able to flush the toilet. Don't have hot water yet though!
We choose a railing that is the same as the balcony railings.
這也是等很久的扶手....
well...終於裝上了
就這麼一小節
ㄎㄎ
We choose a railing that is the same as the balcony railings.
這也是等很久的扶手....
well...終於裝上了
就這麼一小節
ㄎㄎ
Subscribe to:
Posts (Atom)

















